Air Carrier Certification
Welcome
Certification › Options › Requirements › Management › Aircraft › Manuals › Training › Conformity › Proving › OpSpecs › Operate

Aircraft Requirements

The aircraft drives much of the Part 135 certification workload. Its size, equipment, maintenance program, records, and intended operation determine many of the FAA requirements.

Basic Aircraft Requirements

RequirementWhat the Operator Must Show
Registration / Airworthiness

Appropriate registration.

Current airworthiness certificate.

Aircraft is in an airworthy condition.

Exclusive Use

The certificate holder must have exclusive use of at least one aircraft for at least one authorized kind of operation.

Exclusive use may be established by ownership or a qualifying written agreement.

Configuration / Equipment

Aircraft configuration must match the approved operation.

Required instruments and equipment must be approved and operable unless properly deferred.

Special operations may require additional equipment and authorizations.

Maintenance Records

Complete aircraft, engine, propeller, appliance, and life-limited component records.

Airworthiness Directives and required inspections must be current.

The FAA reviews the records as part of aircraft conformity.

Exclusive Use / Dry Lease

The operator must have exclusive use of at least one aircraft. FAA guidance generally requires ownership or a lease agreement covering at least six continuous months from certification.

USAC can provide a dry-lease agreement that has been approved previously and is frequently accepted by the certificate-holding district office.

If the agreement is materially modified or replaced, FAA legal counsel review may be required.

In USAC's experience, legal review of a revised lease typically takes approximately two to three weeks.

Passenger-Seat Configuration Changes the Requirements

9 or Fewer Passenger Seats 10 or More Passenger Seats More Than 19 Passenger Seats

Maintenance generally under Parts 91 and 43 plus applicable Part 135 requirements.

Annual / 100-hour inspections or an approved aircraft inspection program, as applicable.

Continuous airworthiness maintenance program requirements apply.

General Maintenance Manual and expanded maintenance-control system.

Required Inspection Item personnel and inspection controls.

The 10-or-more maintenance requirements continue to apply.

At least one flight attendant crewmember is required.

Additional cabin-safety training and emergency procedures are required.

Aircraft Conformity

Before an aircraft is approved for Part 135 operations, the FAA evaluates the aircraft and records to determine whether the aircraft conforms to its approved configuration and the requirements of the proposed operation.

Registration and airworthiness documents.

Aircraft equipment and configuration.

Maintenance status and inspection history.

Airworthiness Directive compliance.

Life-limited components and overhaul status.

Required instruments, avionics, emergency equipment, and placards.

Proving and Validation

When RequiredPurpose
Turbojet / Certain Two-Pilot AircraftProving tests demonstrate the operator can conduct the proposed operation safely and in compliance with Part 135.
New Aircraft or New Kind of OperationValidation may be required when adding certain aircraft, international operations, Class II navigation, or special authorizations.
FAA DeterminationThe FAA determines the testing needed based on the aircraft, the proposed operation, and the operator's prior experience.

Executive View

QuestionWhy It Matters
Is the aircraft already Part 135 ready?Incomplete records, configuration issues, or overdue maintenance can delay approval.
How many passenger seats is it type-certificated for?The 10-seat threshold changes the maintenance system; more than 19 adds flight attendant requirements.
What operations are planned?IFR, international, RVSM, MEL, lower minimums, and other authorizations can add equipment and approval work.
Has this type been operated by the certificate holder?Proving or validation requirements may apply.

Acquire an Existing Part 135 Charter Company

The buyer can select the aircraft that best fits the intended charter operation.

USAC can evaluate the aircraft and maintenance records before the FAA conformity review.

The aircraft is added to the existing certificate and Operations Specifications after applicable FAA requirements are satisfied.

FAA References

14 CFR 135.25 - Aircraft Requirements

14 CFR 135.143 - General Aircraft Equipment Requirements

14 CFR 135.145 - Proving and Validation Tests

14 CFR 135.411 - Maintenance Applicability

FAA - General Requirements for Part 135 Certification


--- END ---

Privacy Policy
Copyright © 2001-2026 USAC Aviation. All rights reserved.