Air Carrier Certification |
Aircraft conformity verifies that the aircraft, records, equipment, and configuration support the proposed Part 135 operation. USAC prepares the conformity record before the FAA inspection so the inspector can quickly verify compliance.
The USAC operations software organizes the conformity documents in a shared Aircraft Compliance page. Multiple users can prepare and review the record, and the FAA can be provided access to the same organized information.
| Documents and Authority | Configuration and Approvals | Inspection and Operation |
|---|---|---|
|
|
|
|
| Step | Action |
|---|---|
| 1. Submit |
|
| 2. Organize |
|
| 3. Review |
|
| 4. Confirm |
|
| 5. Perform |
|
| 6. Correct |
|
The maintenance records are checked against the maintenance tracking system and the underlying logbook entries. The objective is to prove that the electronic status and the aircraft records agree.
Current inspection status and maintenance program requirements.
Airworthiness Directives and recurring due dates.
Life-limited and time-limited components.
Major repairs and alterations, FAA Form 337s, STCs, and ICAs.
Equipment list and installed equipment.
Weight and balance and applicable scale/calibration records.
Fireblocking, RVSM, and other aircraft-specific requirements, when applicable.
When the records and Aircraft Compliance page are complete, the physical inspection becomes a verification exercise rather than a discovery exercise.
Verify placards and equipment serial numbers.
Confirm required aircraft documents and manuals are aboard.
Confirm briefing cards and emergency equipment are aboard, current, and properly located.
Confirm the aircraft configuration agrees with the conformity record.
| Capability | Benefit |
|---|---|
| Shared Web Record | Operations, maintenance, management, and FAA personnel can work from the same organized conformity record. |
| Document Checklist | Missing and incomplete documents are visible before the FAA inspection. |
| GMM Procedure | The conformity process is documented and repeatable rather than recreated for each aircraft. |
| Pre-Conformity Review | Records and aircraft discrepancies are corrected before the FAA review. |
| Efficient FAA Review | A well-prepared package allows the FAA physical conformity to concentrate on verification. USAC normally plans about a half day for the physical conformity. |
As an example of the preparation process, USAC is currently using this system to prepare a Falcon 50 conformity package on a seven-day preparation schedule. Actual FAA review time depends on aircraft condition, records, configuration, inspector availability, and discrepancies found.